top of page
Chemical Recovery Boiler
Rebuild & Capacity Upgrade.
Capacity increased by 60% for Satia Industries Ltd
Reotech has upgraded Chemical Recovery Boiler (RB#2) for highest capacity of 63% from 400 to 650 tds/d with supply planned and completed in very short time frame of four and a half months, which is first of its kind in the nation.
• Pressure parts rebuild
• New Furnace Floor
• Upgraded multilevel air system
• Upgraded black liquor system
• Modified new superheaters
• Modified new Economiser
The result of this recovery boiler rebuild are
• High increase in Capacity
• Higher runability
• Improved Environmental performance
SATIA INDUSTRIES LTD., Rupana, Punjab, India
bottom of page